Architectural Review Committee Please fill out the form below if you would like to make improvements to your home’s exterior. Click Here to see what MUST be approved by ARC Application for Exterior Alterations for Beacon Pointe Homeowners Association — Refer to the Architectural Review Committee Regulations — All areas on this application must be completed. and all special requirements must be satisfied.(Required) I understandName(Required) First Last Address Street Address Address Line 2 Email(Required) Enter Email Confirm Email Phone(Required)Description of Proposed Alteration (include contractor's name doing the work and Town of Cedar Lake contractor license #, if other than owner doing the work)(Required)The ARC will determine if other documentation is required (drawings, location on plot plan of alteration, specifications and/or photographs of material used) and will inform the owner of said requirements by phone or e-mail. (If space is insufficient, attach a continuation sheet)Proposed Starting Date(Required) MM slash DD slash YYYY Consent(Required) I agreeWork is to be completed within three months after approval by the Architectural Review Committee. I agree to comply with the Beacon Pointe Declaration of Covenants, Conditions, and Restrictions, Cedar Lake and Lake County zoning rules and building codes in making the above-described alteration. The ARC wil determine if a town or county permit is required to do the above Alteration. It is the owner’s responsibility to acquire the Permit and give a copy to the ARC. Consent(Required) I agreePermission is hereby granted to ARC members and Beacon Point Homeowners Association agents to enter on my property to make reasonable inspections) of the location(s) of the proposed alteration and the completed alteration.Date(Required) MM slash DD slash YYYY Name(Required) (Electronic Signature)Upload Necessary FilesMax. file size: 50 MB.EmailThis field is for validation purposes and should be left unchanged. Δ